Home | Organisers | Exhibitors

 

    Our company, specialised in water supplying, from 1992 ,  execute all the works beginning with the capture phase by drilling including afferent eguipment, supply and distribution network.
    Beginning with  the year 2005 our company has a new domain of activity: driling pilots.
     The company have a social capital for 75000 lei, registered to Reg. Comm.
    The furnished and repairs base is on Alexandriei Road no. 136, and have a 6600 mp field and a place for repairs for 600mp.
    The society is with integral private capital, the social parts beeing mr. Gheorghiu Jean for 95% and mrs. Gheorghiu Carmen for 5%.
  The company have in the present a number of 60 employers : ingineers, economists, technicians,foremans, workers.
    We have the certificate no. 116  issued  by the WATER FOREST AND MEDIUM MINISTER  for execution and  projection in water supplying domain.
    Certificate SRAC:
-    ISO 9001  18.09.2006
-    ISO 14001  18.09.2006
-    OHSAS 18001  18.09.2006
The drilling depth that we can execute is varying between 40 and 300 linear meters.
        WORK DESCRIPTION
    1.    Drilling execution including the import endowment with submersible pumps and front column
    2.    Drilling execution by polyethylene tubes having a medium length of 3 km.
    3.    Pumping stations
    4.    Distribution network having a medium length of 5 km
    Drilling will be executed with  hydraulically installation with inverse circulation. At separation, there will be utilised a blade bid with of 444.4 mm diameter.After separation of the well at the depth provided in the ingineering design, there will be made the electrical sampling to exactly establish  the filter positions.
    At tubing, there will be utilised  PVC pipes type TERAPLAST, with diameter 6 5/8 inch.
    In front of the filter zone, will be introduced PVC filters. To create the in inverse filter wiil be introduced gravel. Upper layers will be blockaded with cement stopper. The metal column will be isolate against the rust.
   Drilling  cabin  is  assigned  to protection and has the following dimensions: 2x2x2m. Cabin is half-buried at a depth that will be established by the general designer.
    The repression column used is made from  2 inch polyethylene.
   Electrical  panel  provided  with thermal protection and waterproof protection protect automation. Electrical panel is also provided with relay against damages to general installation.

Contact:
JEAN GHEORGHIU
15 Tutunari, 87 B Block. ap.24, sector 5, Bucharest , Romania,
Phone: 0040.21.330.01.26
Fax: 0040.21.330.75.51
e-mail: prodac@mailbox.ro


Home | Organisers | Exhibitors